Military · Law Enforcement · Mission Training 866-4AM-IDON

Subterranean Conversions

Turn existing shoot houses into a connected subterranean battlespace.

Amidon keeps the existing shoot houses in place, builds new full-height eight-foot passages between them at existing grade, and then adds engineered roof systems. Berming or earth cover remains an optional phase based on mission objectives, budget and future expansion needs.

01Reuse capital assets

Expand capability without discarding proven structures.

02Build at existing grade

New eight-foot passages match the existing wall height; roofs follow the approved geometry.

03Train across modalities

Support separate live-fire and non-lethal evolutions.

A conversion—not a replacement

Transform isolated structures into one operational environment.

Most facilities do not need to start over. Existing shoot houses become the anchors of a larger complex, joined at grade by new tactical passages built to the same eight-foot wall height—not excavated below grade.

Engineered roof systems then create controlled interior conditions. Berming or earth cover is a separate, optional phase selected only when the mission objectives, budget and future expansion plan support it.

The conversion path

A controlled progression from geometry to mission-ready training.

01

Assess

Document the existing structures, terrain, ammunition, firing directions, access and utilities.

02

Connect

Build full-height eight-foot passages, intersections, emergency egress and specialized routes at grade.

03

Roof

Add engineered roof systems, protected penetrations, drainage and serviceable utility pathways.

04

Activate

Commission ventilation, lighting, sensing and environmental effects for the approved training modes.

From separate buildings to one battlespace

Connect at grade. Add roofs. Berm only when the mission requires it.

The existing shoot houses remain in place. New passages, turns, intersections, access points and emergency routes are built at the same eight-foot height and on the same grade. Roofs and integrated systems follow the approved geometry; berming is a separate option.

01
Concept showing existing shoot houses connected by full-height tactical passages before roofing
Connected at gradeExisting structures become anchors for new tactical movement routes.
02
Optional cutaway concept showing the roofed training complex with earth berming
Optional bermingEarth cover can be added when mission objectives, budget and expansion plans support it.

Concept visualizations. Berming is shown as an optional end state—not a required part of the conversion. Final geometry, structural design and system configuration are project-specific.

Integrated realism

Control the environment. Change the problem.

Subterranean training is defined by limited visibility, constrained movement, disrupted orientation and sensory load. Amidon can integrate the systems that let instructors shape those variables—while maintaining control, monitoring and emergency override.

SYS—01

Ventilation & airflow

Engineered supply, exhaust and purge capability support occupancy, smoke clearance and the approved ammunition envelope.

  • Zone-level airflow control
  • Air-quality and pressure monitoring
  • Serviceable, protected duct routes
SYS—02

Mission lighting

Normal, low-light, no-light and emergency conditions can be selected by zone without sacrificing instructor control.

  • Dimmable and color-selectable fixtures
  • Protected wiring and controls
  • Emergency egress illumination
SYS—03

Sensors & observation

Protected sensing and observation points can support safety monitoring, system status and after-action review.

  • Environmental and occupancy sensing
  • Door, route and event monitoring
  • Instructor and AAR integration
SYS—04

Environmental emitters

Localized sound, scent and approved theatrical smoke add mission cues that demand interpretation—not memorization.

  • Programmable sound zones
  • Controlled scent delivery
  • Interlocked smoke effects and purge

One facility. Two training modes.

Design for the ammunition—and the decision-making.

A converted complex can support both service-ammunition live fire and purpose-built non-lethal training ammunition. Each mode is governed by its own validated configuration, safety controls and operating procedures.

LIVE

Live-fire training

Regular service ammunition

Ballistic geometry, roof protection, ventilation, lead controls, utility protection and egress are designed around the approved weapon and ammunition envelope.

  • Close-quarters live-fire movement
  • Low-light and confined-space engagements
  • Multi-room and passage transitions
NLTA

Non-lethal training

Force-on-force capability

Approved non-lethal ammunition systems support opposing-force interaction, judgment, communication and tactical problem-solving inside the same complex.

  • Force-on-force scenarios
  • Decision-making under sensory load
  • Role-player and casualty integration

Operational rule: live-fire and non-lethal force-on-force evolutions use distinct, controlled configurations. They are not mixed within the same training iteration.

Training applications

Build complexity without building an entirely new facility.

Subterranean operations Confined-space CQB Low-light / no-light K9 movement routes Multi-team coordination Communications-degraded operations Casualty movement Search and clearance

Project-specific by design

A roof alone does not make a live-fire subterranean facility.

The safe, credible answer comes from coordinating the ballistic, structural, mechanical and operational requirements as one system. Amidon begins with the training objective and ammunition—not a predetermined configuration.

01

Weapons & ammunitionApproved calibers, projectile types and firing volume.

02

Geometry & firing directionEngagement zones, openings, passages and no-fire conditions.

03

Ballistic & structural systemsWalls, roof, interfaces and loads, with earth cover evaluated only when selected.

04

Air & exposure controlsVentilation, purge, lead controls and environmental monitoring.

05

Life safety & accessEmergency egress, fire response, drainage and instructor intervention.

06

MaintainabilityProtected but accessible utilities, sensors, emitters and replaceable components.

Start with the existing geometry

See what your current shoot house can become.

Provide the existing floor plan, site conditions, training objectives and expected ammunition envelope. Amidon will frame the conversion path, phasing and project-specific engineering questions.

Discuss a conversion