Military · Law Enforcement · Mission Training 866-4AM-IDON
Trainee moving through the Amidon Gauntlet CQB training complex during a live-fire exercise with green smoke concealment

Amidon Gauntlet · MDO Training Facility

Next-generation training for modern warfare.

A revolutionary approach to Multi-Domain Operations (MDO) training. For over 15 years, 360° Ballistics has been at the forefront of live-fire training facility development for the U.S. military, delivering Amidon Ballistic Concrete® solutions designed for unmatched safety and durability. Recognizing the evolving demands of MDO, we developed The Gauntlet — a cutting-edge training system built to enhance Close Quarters Battle (CQB) readiness.

Built to enhance CQB readiness

  • 100% reconfigurable & sustainable training devices.
  • Advanced integration with the latest training technologies.
  • Fully modular, relocatable foundation systems.

Unparalleled flexibility & realism

The Gauntlet is designed to support next-level MDO training, adapting to the rapidly shifting challenges of modern warfare.

  • Dynamic, ever-changing training environments tailored to specific mission objectives.
  • Seamless relocation & reconfiguration to accommodate evolving tactical requirements.
  • Compatibility with cutting-edge training technologies for enhanced operational effectiveness.
Close-up of Amidon Gauntlet vertical support beams and precast ballistic concrete wall panels

A rapidly reconfigurable, sustainable replacement

The Gauntlet is built as a rapidly reconfigurable and sustainable replacement solution for unsafe metal shipping containers — a common but hazardous stand-in for CQB training props. In its place, the Gauntlet gives units a ballistic-rated, modular structure built specifically for live-fire training.

Construction specifications

Wall thickness3 inches or more
Standard wall height8 feet
Wall lengths5 feet to 12 feet
Wall bases6 inches thick, 10½ inches wide
Wall headers12 inches thick, 10½ inches wide
Vertical support beams3 inches thick, spaced a maximum of every 2 feet
Beam extension7½ inches from the walls
Compressive strength5,000 psi minimum after 28 days of curation
Entrained air5–8%
Steel reinforcementWelded Wire Reinforcement, ASTM A497 / A615
Floor plan schematic of an Amidon Gauntlet training module showing a shared central area and surrounding rooms
Representative Gauntlet module floor plan.
Floor plan schematic of a four-room Amidon Gauntlet training module with solid corner construction
Four-room configuration with solid corner construction.

Prepare for the future of warfare.

The battlefield is evolving, and so should your training. Contact us today to learn how The Gauntlet can transform your training operations.

Contact Us