What Is Ballistic Concrete — And Why It Matters for Live Fire Training

  • May 14, 2026

Design Services: From Concept to Range Layout

Intro: Before a single ABC panel is manufactured, a facility has to be designed - and design, for a live-fire structure, means more than aesthetics. It means solving for safety, mission requirements, and site conditions simultaneously.

Starting From the Mission, Not the Blueprint

A design process that starts with what training scenarios a facility actually needs to support, rather than a generic template, is more likely to produce a layout that holds up under real use.

Site-Specific Constraints

Every site has its own terrain, space limitations, and safety-distance requirements. Design services account for these directly rather than forcing a standard layout onto a site that doesn't fit it.

Where Design Hands Off to Production

Once a layout is finalized, design work transitions into production and installation - the same underlying modular ABC system, just moving from planning into physical construction.